PureBOX® at Budakalasz
968 PureBOX® units have been installed as a stormwater infiltration system in Budakalász, where a new car showroom and warehouse are being built.

PureBOX® at Budakalasz

968 PureBOX® units have been installed as a stormwater infiltration system in Budakalász, where a new car showroom and warehouse are being built.

purebox1.png

The latest investment of the Duna Auto Group is the construction of a new 90,000-square-metre site in Budakalász, which will be built and operated with a focus on sustainability and environmental protection. They aim to create Hungary's largest e-mobility service and competence centre, which will provide a full range of services, primarily for cars.

We are delighted to have been part of this great project with our latest development, the PureBOX® infiltration system, made from 100% recycled material and powered by renewable energy.

purebox5.png

Rainwater falling on the site in Budakalasi partially infiltrates green areas and is drained off the paved surfaces.
Stormwater runoff from roof surfaces and areas not exposed to pollution will be discharged into the area next to the halls.

Because during the winter season, the freezing of the upper soil layers means that the infiltration is not always efficient in open surface reservoirs, the solution is to install a block-type, underground system, such as PureBOX®.

purebox2.png

Thanks to its robust design, PureBOX® can tolerate a wide range of environmental conditions, has exceptional load-bearing capacity and is ideal for efficiently capturing and managing stormwater.

Manufactured in a 100% renewable energy domestic factory and from recycled raw material, the product has a low carbon footprint, contributing to protecting our environment and achieving a circular economy.

tnc_kep.jpg

We have installed stormwater treatment facilities in paved areas that are unprotected against contamination and where rainwater cannot be immediately infiltrated. Our ENVIA TNC systems are made of reinforced concrete and suitable for stormwater pretreatment before drainage. In Budakalász, we installed 1 piece of TNC 65-2-A, 1 piece of TNC 65-5-A and 2 pieces of TNC 1,5-5-A oil traps.

Our cost-effective stormwater management solution is economically feasible, has a long lifespan, and is an excellent fit with the client's sustainability ambitions.